Related leaders attended the ceremony, including Henry T Sy,Jr., chairman of SM based in Manila, executive vice-president Jose Mari Banzon, assistant vice-president Grace M. Sta. Ana, senior vice-president Lee Meng Kong, Philip C.K Ong, project director of SM Chengdu Real Estate Department, Mr. Pan Kaiyi, president of Sichuan Huayan Group Corporation, etc. At 10:30 am, after Chinese traditional lion dance, leaders laid a foundation for SM residential project with fanfare and firecrackers under the witness of all guests and staff on-site. This historic moment deserved to be recorded forever.
Finally, the groundbreaking ceremony came to a perfect ending in applause and salutes lingering in the sky. Located at No.29, East Section 2, 2nd Ring Road, Chenghua District, this proposed project consists of seven high-rise apartment buildings and four floors of basement overall, covering an area of about 25,000 square meters with gross floor area is 175,000 square meters. These seven high-rise apartment buildings including: three 33-storey, 102.90-meter high buildings, two 32-storey, 99.50-meter high buildings and two 26-storey, 82.25-meter high buildings; besides, the depth of basement is 17.1 to 18.9 meters. Taking into consideration of large load from high-rise buildings and depth of basement, ground strength, deformation and excavation supporting, dewatering are demanding for SM residential project, also, the design safety rank is first class.
The commencement of SM residential project marks a significant advance of Huayan Group. With our collective wisdom and strong team spirit, sticking to enterprise values of “integrity, enterprise, common development”, we are with firm confidence that SM residential project will certainly be another high-quality project.